Founded 1989
Personnel: 6 equiv.
Associations
IPPSO
ASME
ASHRAE
EIC/CSME
AWWA/OWWA
WEF/WEAO
Contacts
· George Aldworth, P. Eng. (mechanical)
· David Moon, P. Eng. (electrical)
· Richard Saab, B.E.Sc. (mechanical)
Sub-Sectors
· cogeneration / energy efficiency
· solid and hazardous waste management
· water and wastewater treatment; environmental protection
· air pollution control
Firm Type
Consulting Engineering (mechanical/electrical)
Incorporated 1989; member - Consulting Engineers of Ontario
Description
Aldworth Engineering Inc. is involved in the following areas:
ENERGY DESIGN: biogas and natural gas cogeneration plants, district energy systems, boiler plants and stacks, energy audits, and HVAC.
PROCESS DESIGN: municipal and industrial process plants, solid waste facilities incl. incinerators, water & wastewater treatment plants, and air pollution control.
SPECIALTY AREAS: process equipment & piping, instrumentation, high-rate ventilation & odour control, electric power & control, freeze-protection systems, pumping systems & waterhammer control, insurance investigations, small community water & sewage, biomedical waste, fire protection.
TYPICAL PROJECTS:
· National Research Council, Ottawa, gas-turbine cogeneration plant, 4.0 MW
· Toronto Beare Rd. landfill gas engine power plant, 5.6 MW (recip.)
· Energy Plus 2000 / Ajax Energy steam-turbine cogen plant, 650 kW
· electric power & controls for the preceding power plants, including utility interfacing
· energy audit for Atrium 2 Condominium, North York
· edible fats plant odour control for Canada Packers, Toronto, plus ammonia spill safety plan
· refuse odour control for Toronto Commissioners St. Transfer Station
· leachate pumping system for Taro Quarry Landfill, Stoney Creek
· biosolids management study for South Peel Lakeview & Clarkson WPCP's